Power Cable Connection Specifications

Part of the local electrical work for three-phase power feed is connecting the power cable from the power distribution board directly to the Power Cabinet terminal board.

Make sure that the facility administrator or a qualified electrical engineer performs the electrical work.

Power Cabinet

Cover

Remove the cover

FG

( Mark)

ACS for dual power feed

ACS for base power feed

Compression terminal (x10)

Bolt diameter: M6 (L1/L2/L3/N/FG)

Power cable

M8000: AWG10

M9000: AWG8

FIGURE 2-9Three-Phase Star Power Supply Connections

2-20SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007