Chapter 2 Installing the Server 21
Note – When you attach cables to the server,as in the following procedures, lay the
cables over the cable management bracket, then use cable ties to hold each cable in
place.
Removing the Server From the Rack forService
Toinstall or replace internal parts in the server, you must first remove the server
from the rack.
For the removal procedure, referto the SPARC Enterprise T1000 Server Service
Manual.
Connecting the Server Cables
Toboot the server, you must connect and configure the network and serial ports. The
procedures are given in the following sections.
“ToConnect the SC Serial Management Port” on page 22
“ToConnect the SC Network Management Port” on page 22
“ToConnect the Ethernet Network Cables” on page 23
“ToConnect the AC Power Cable to the Server” on page 23
FIGURE2-9 shows the connectors on the rear panel of the server.
FIGURE2-9 RearPanel Connectors
SC network management port
SC serial management port
NET3
NET2
NET1
NET0 TTYA serial port
AC in