vi SPARC Enterprise T1000 Server Installation Guide • April 2007
▼To Install the Cable Management Bracket 20
Removing the Server From the Rack for Service 21
Connecting the Server Cables 21
▼To Connect the SC Serial Management Port 22
▼To Connect the SC Network Management Port 22
▼To Connect the Ethernet Network Cables 23
TTYA Serial Port 23
▼To Connect the AC Power Cable to the Server 23
3. Powering On the System 25
Powering On the Server for the First Time 25
Power On Overview 25
System Console 25
ALOM CMT System Controller 26
Passwords 26
▼To Power On the System for the First Time 27
Logging In To the ALOM CMT System Controller 29
▼ToLog In Tothe System Controller Using the Serial Management Port 29
▼To Log In To the System Controller Using the Network Management
Port 30
▼To Configure the System Controller Network Management Port 31
▼To Reset the System Controller 34
Using the ALOM CMT System Controller for Common Operations 35
▼To Initiate the Power On Sequence 36
▼To Connect to the System Console 36
▼To Perform a Normal System Initialization 37
Booting the Solaris Operating System 39
▼To Boot the Solaris Operating System 39
▼(Optional) To Reset the System 40