Furuno FA-150 Cable connection at transponder, Fabrication of cables TTYCS-4 and TTYCS-1Q

Models: FA-150

1 54
Download 54 pages 24.96 Kb
Page 21
Image 21

Cable connection at transponder

Fabrication of cables TTYCS-4 and TTYCS-1Q

L

50

Shield

Remove paint￿

 

by 50 mm.

 

Cut vinyl sheath.

L:Depends on equipment connected. Measure at the transponder.

Expose core and fold back￿ shield onto cable.

Vinyl tape

45

6

Lay in clamp￿ where paint￿ was removed.

Connection

Wiring for WAGO connector

Press downward.

Terminal opener

Wire

Twist

WAGO connector

Procedures

1.Twist the cores.

2.Press the terminal opener downward.

3.Insert the wire to hole.

4.Remove the terminal opener.

5.Pull the wire to confirm that it is secure.

15

Page 21
Image 21
Furuno FA-150 installation manual Cable connection at transponder, Fabrication of cables TTYCS-4 and TTYCS-1Q, Connection