1. INSTALLATION

1.3Installing the Processor Unit

The processor unit should be mounted aligned with the ship’s fore-and-aft line. It can be mounted on the deck, bulkhead, or on the underside of a desk. Choose a mounting location which allows you to easily view the power lamp on the top of the unit and which is within ± 2.5° of the ship’s fore-and-aft line.

1.3.1Bulkhead mount

The processor unit is shipped from the factory ready for bulkhead mounting. Orient the processor unit as shown below and fix it to the mounting location with four tapping screws (M5x20). You will set the orientation later on the menu.

Reference Direction

Bulkhead

Mount processor unit so

±reference direction is within

2.5° of fore-and-aft line.

Name Plate (other side)

 

Direction

Mounting Method: "Wall"

 

A

(Bulkhead)

 

 

Mounting Direction: A

Direction D

 

Direction B

Mounting Method: "Wall"

 

Mounting Method: "Wall"

(Bulkhead)

 

(Bulkhead)

Mounting Direction: D

Direction

Mounting Direction: B

CMounting Method: "Wall" (Bulkhead)

Mounting Direction: C

Bulkhead mount