Spartan Operation and Maintenance Manual

4.4 Unpacking

INFORMATION: All shipments are ex-works. At our docks, title passes to the buyer. Please review your insurance coverage prior to shipment, as you are responsible for all subsequent freight charges and risks.

INFORMATION: Before signing the Bill of Lading, be sure to inspect the crate, box and/ or pallet for signs of damage or missing items. If applicable, make note of this on the Bill of lading.

1.Inspect the machine for any obvious shipping damages upon receipt.

2.Carefully unwrap the shrink wrap from around the laminator.

CAUTION: Do not use a knife or other sharp object to remove any shrink wrap from around the laminator. You can cause irreparable damage to the rollers!

3.With another person, carefully remove the contents and assemble the laminator.

4.With assistance, carefully move the laminator to the desired location.

WARNING: Do not attempt to move the laminator across anything other than a flat level surface alone. You can be crushed or seriously injured.

WARNING: Do not turn the laminator sideways, up side down or vertical when moving. This will disrupt the alignment of internal moving parts.

Page 4-4

© 2004 General Binding Corporation

Page 16
Image 16
GBC 930-073 manual Unpacking