GE ACB AJCS 09 Window Installation-Optional, Window Requirements, Installation Instructions

Models: LCB AJCQ 10 DCB AJCQ 06 DCB AJCS 06 LCB AJCQ 08 LCB AJCS 08 ACB AJCQ 12 LCB AJCS 10 ACB AJCS 09 ACB AJCH 12 ACB AJCS 10 ACB AJCS 12 DCB ACB AJCQ 10

1 72
Download 72 pages 6.63 Kb
Page 16
Image 16
WINDOW INSTALLATION—OPTIONAL

Installation Instructions

WINDOW INSTALLATION—OPTIONAL

FOR MODELS AJES06LSB, AJES08ASB, AJES10DSB and AJHS08ASB

Read these instructions completely and carefully.

 

 

Vinyl window

 

 

gasket

Sill support

Case side

 

bracket (2)

 

 

gasket (2)

 

 

2 angles

 

 

(left and

Foam top

 

right hand)

 

 

window gasket

 

Spring

Case top gasket

 

clip (4)

 

B

A

Bottom window gasket

Right

Left side

 

side

 

 

(holes are on the left)

Filler

Window

Panels

locking

Cut panels

bracket

and

 

discard

 

center

 

piece

 

ontheareright)(holes

 

 

 

Air conditioner

 

 

Support bracket hardware

 

Type C (painted) (6)

Spacer (2)

Type A (9)

 

Type D (2)

Lock nut (2)

 

 

 

 

 

Type E (4)

 

 

Adjusting bolt (2)

 

Type B (2)

Large washer (2)

1

WINDOW REQUIREMENTS

These instructions are for a standard double-hung window. You will need to modify them for other types of windows.

The air conditioner can be installed without the accordion panels if needed to fit in a narrow window. See the window opening dimensions to the right.

All supporting parts must be secured to firm wood, masonry or metal.

The electrical outlet must be within reach of the power cord.

17min.

31to 43

(With filler panels)

2614min.

(Without filler panels)

Window opening dimensions are for a

standard double-hung window.

16

Page 16
Image 16
GE ACB AJCS 09, ACB AJCQ 10, ACB AJCS 12 DCB Window Installation-Optional, Window Requirements, Installation Instructions