Manageable 8/9-Port Switch

CONNECTING TO POWER

External Power

Step One: Wire the supplied AC power adapter to the “A” receptacle plug at the front of the switch. — white stripe to pin 1 (+), black to pin 2 (-).

Step Two: Attach the plug into a standard AC outlet with the appropriate AC voltage.

Primary “A” Power Connector

Secondary “B” Power Connector

To Primary Wall Supply

To Secondary Supply

(D7600-MM-E-CC Shown))

Note: The secondary supply must be equal to or less than the potential of the primary supply.

Power-On Self Test (POST)

The switch performs its Power-On Self Test (POST) when the power is applied to the switch. During the POST, the switch CPU will:

-Perform a series of diagnostic procedures to make sure the basic system is functioning properly

-Decompresses the main switching software runtime image from the flash ROM into the DRAM area

User’s Manual

16

Page 20
Image 20
GE D-GES7600 manual Connecting to Power, External Power, Power-On Self Test Post