Manuals
/
GE
/
Household Appliance
/
Water Heater
GE
GN94DNSRSA, GP94DNSRSA, GN75DNSRSA
warranty
Ladder Diagram
Models:
GP94DNSRSA
GN94DNSRSA
GN75DNSRSA
1
25
28
28
Download
28 pages
47.76 Kb
21
22
23
24
25
26
27
28
<
>
Install
Ladder Diagram
Dimension
Configurations
Cleaning the Inlet Filter
Safety Precautions
Technical Data
Page 25
Image 25
Installation Instructions
LADDER DIAGRAM
25
Page 24
Page 26
Page 25
Image 25
Page 24
Page 26
Contents
Safety Precautions
Before Beginninginstallation
For Your Safety
Models GN75DNSRSA, GN94DNSRSA, GP94DNSRSA
Safety Precautions
Installation Instructions
Tools YOU will Need
Parts Provided
GN75/GN94/GP94DNSRSA
Dimensions
Description
INTAKE/EXHAUST Guidelines
Planning for Venting
Flue Terminal Clearances Ansi Z21.10.3 CSA
Flue Terminal Clearances
Additional Clearances Vent Terminal
Horizontal Termination with
Flue Installation Condensate Drain
Condensate Drain
Shown with optional pipe cover
Planning for Plumbing
Corrosive Atmospheres
Clearances for Water Heater
Mounting the Water Heater
Mounting the Waterheater
Mounting the Water Heater
GAS Piping
GAS Piping
Connecting the Water Heater to the GAS Supply
Water Piping
Water Piping
Pressure Relief Valve
Internal BUILT-IN Freezer Protection
Supplemental Freeze Protection
Connecting the Water Heater to the Water Supply
KEY
Recommended Piping for Basic Installation
Freeze Protection For External Piping
Electrical Requirements
Electrical Connection Information
Venting Instructions
Venting Instructions
Condensate
Maximum Vent Length
Vent Products
Flue Installation Concentric Venting
Product Parts
Guidelines
High Altitude Installations
Configurations
Remote Controller Installation
Location
Mounting the Controller
Cleaning the Inlet Filter
Cleaning the Inlet Filter
Installation Checklist
Pressure Drop Curve
Technical Data
Outlet Flow Data
Ladder Diagram
Page
Top
Page
Image
Contents