Before Applying Power: Checklist

Before installing the board in a VMEbus system go through the following checklist to verify that the board is ready for the intended operation:

1.Have the chapters on Theory and Programming of the DAC board, Chapters 3 and 4, been read and applied to system requirements?

2.Review Table 2-1 on page 2-3 to verify the factory installed jumpers and board address switches are set to what is desired.

To change DAC board switches (S1 and S2) refer to “Board Address Selection Switches” on page 2-5.

To change address modifier response jumper (JB) refer to “Address Modifier Response Selection” on page 2-7.

3.To change the DAC digital code selection refer to “Digital Code Selection” on page 2-8.

4.To use either the program controlled start convert mode or the external start convert mode refer to “Program Controlled and External Start Convert Mode” on page 2-9.

5.Has the cable, with proper mating connector, been connected to the analog output connector (P3)? Refer to “Connector Descriptions” on page 2-10 .

Digital-to-Analog Converter Board Installation

After steps 1 through 5 have been reviewed, the DAC board may be installed in a VMEbus system. (Do not install or remove the board with power ON). The DAC board may generally be installed in any slot position, except slot "one" which is usually reserved for the master processing unit.

2-4

IC697VAL348 8-Channel, 16-bit Digital-to-Analog Converter Board User’s Manual

GFK-2059

 

– December 2001

 

Page 11
Image 11
GE IC697VAL348 user manual Before Applying Power Checklist, Digital-to-Analog Converter Board Installation