GE JCB920 Instructions Operating Instructions Safety, Power Cord will be Disconnected Frequently

Models: JCB910 JCB920

1 60
Download 60 pages 50.17 Kb
Page 48
Image 48
Instructions Operating Instructions Safety

Instructions

Installation of the range (cont.).

Instructions Operating Instructions Safety

 Electrical ConnectionsPower Cord will be DisconnectedElectric Disconnect Electrical Connections

Usage Situations where Appliance

Power Cord will be Disconnected

Frequently.

Do not use an adapter plug in these situations because disconnecting of the power cord places undue strain on the adapter and leads to eventual failure of the adapter ground terminal. The customer should have the two-prong wall receptacle replaced with a three-prong (grounding) receptacle by a qualified electrician before using the appliance.

The installation of appliances designed for mobile home installation must conform with the Manufactured Home Construction and Safety Standard, Title 24 CFR, Part 3280 (formerly the Federal Standard for Mobile Home Construction and Safety, Title 24, HUD, Part 280) or, when such standard is not applicable, the Standard for Manufactured Home Installations, latest edition (Manufactured Home Sites, Communities and Set- Ups), ANSI A225.1, latest edition, or with local codes. In Canada, mobile home installation must be in accordance with the current CAN/CSA Z240/MH Mobile Home Installation Code.

Electric Disconnect

Locate disconnect plug on the range back.

Pinch sides of connector and pull out of range back.

Troubleshooting Tips Installation

Customer Service

 Seal the Openings Check Ignition of Surface BurnersManual background Seal the Openings

Seal any openings in the wall behind the range and in the floor under the range when hookups are completed.

Manual backgroundManual backgroundManual background Check Ignition of Surface Burners

Operation of all cooktop and oven burners should be checked after the range and gas supply lines have been carefully checked for leaks.

Electric Ignition Models

Select a top burner knob and simultaneously push in and turn to LITE position. You will hear a clicking sound indicating proper operation of the spark module. Once the air has been purged from the supply lines, burners should light within 4 seconds. After burner lights, rotate knob out of the LITE position. Try each burner in succession until all burners have been checked.

48

Page 48
Image 48
GE JCB920, JCB910 Instructions Operating Instructions Safety, Electrical Connections Usage Situations where Appliance