6FINAL INSTALLATION CHECKLIST

Installation Instructions

6FINAL INSTALLATION CHECKLIST

Check to make sure the circuit breaker is closed (RESET) or the circuit fuses are replaced.

Be sure power is in service to the building.

Check to be sure that all packing materials and tape have been removed. This will include tape on metal panel under control knobs (if applicable), adhesive tape, wire ties, cardboard and protective plastic. Failure to remove these materials could result in damage to the appliance once the appliance has been turned on and surfaces have heated.

Check to make sure that the door and drawer are parallel to each other and that both operate smoothly. If they do not, see the Owner’s Manual for proper replacement.

Check to make sure that the rear leveling leg is fully inserted into the Anti-Tip bracket and that the bracket is securely installed.

7OPERATION CHECKLIST

Turn on one of the surface units to observe that the element glows within 60 seconds. Turn the unit off when glow is detected.

If the glow is not detected within the time limit, recheck the range wiring connections. If change is required, retest again. If no change is required, have building wiring checked for proper connections and voltage.

Check to make sure the Clock (on models so equipped) display is energized. If a series of horizontal red lines appear in the display, disconnect power immediately. Recheck the range wiring connections. If change is made to connections, retest again. If no change is required, have building wiring checked for proper connections and voltage. It is recommended that the clock be changed

if the red lines appear.

Be sure all range controls are in the OFF position before leaving the range.