GE JCB905, JCB968 Installation Instructions, Prepare To Install The Range, Tools You Will Need

Models: JCB905 JCB968

1 48
Download 48 pages 16.16 Kb
Page 37
Image 37
Installation Instructions

Installation Instructions

PREPARE TO INSTALL THE RANGE

TOOLS YOU WILL NEED

Drill with 1/8” Bit

Safety Glasses

Adjustable WrenchPREPARE TO INSTALL THE RANGE Tape Measure

Phillips Screwdriver

Pencil

Flat-bladeLevel Screwdriver

MATERIALS YOU MAY NEED

Lag Bolts

Anchor Sleeves

(For Anti-Tip Bracket Mounted

on Concrete Floors Only)

PARTS INCLUDED

Anti-Tip Bracket Kit

1 PREPARE THE OPENING

See illustrations for all rough-in and spacing dimensions.

The range must be placed with 1/2” minimum clearance at the back wall and side walls of the cabinet.

**30” Min.

TOOLS YOU WILL NEED ***6” MATERIALS YOU MAY NEED Min. PARTS INCLUDED

**15” Min.

Acceptable electrical outlet area.

Orient the electrical

3”

receptacle so the length1 PREPARE THE OPENING25 is parallel to the floor.Manual background

Manual background 3”

712

36”

30”

*12” Min.

 

 

 

 

 

*12

 

 

 

 

 

 

 

 

 

 

 

 

 

Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MINIMUM DIMENSIONS BETWEEN COOKTOP, WALLS AND ABOVE THE COOKTOP:

*** Make sure the wall covering, countertop and cabinets around the range can withstand the heat (up to 200°F) generated by the range.

*** Allow 30” minimum clearance between surface units and bottom of unprotected wood or metal cabinet, and 15” minimum between countertop and adjacent cabinet bottom.

***Recommended spacing to heat-sensitive surfaces.

37

Page 37
Image 37
GE JCB905, JCB968 Installation Instructions, Prepare To Install The Range, Tools You Will Need, Materials You May Need