Installation Instructions
PREPARATION
TOOLS AND PARTS NEEDED
•Large
•Phillips screwdriver
•3/8″ socket and ratchet
•Saw
•Carpenter’s square
•Pipe wrench
•Gas line shut off valve
•Pipe joint sealant for use with gas connections that resists action of LP gas
For flexible connection where local codes permit:
•Flexible metal tubing (same 3/4″ or 1/2″ I.D. as gas supply line)
•Flare union adapter for connection to supply line (3/4″ NPT x 3/4″ I.D. or 1/2″ NPT x 1/2″ I.D.)
•Flare union adapter for connection to regulator (1/2″ NPT x 3/4″ I.D. or 1/2″ I.D.)
For rigid connection:
• Pipe fittings as required
IMPORTANT
Motor
NOTE: Where possible, 6″ (15.2 cm) is recommended for motor/blower service.
Side
You must allow room enough to remove and empty grease container(s).
CAUTION: Warranty is void on equipment installed other than as recommended by GE. Recommended wall caps and transitions must be used for proper operation and installation.
PREPARING FOR INSTALLATION
Tie down bolt |
|
|
|
|
|
on each end |
|
|
|
| Pressure Regulator |
|
|
|
|
| |
*Blower can be swiveled 90° |
| Wiring Box Cover | |||
Grease Container |
|
|
| ||
29″ ± 1⁄16″ | 21″ ± 1⁄16″ | ||||
73.66 ± .16 cm | 53.5 ± .16 cm | ||||
|
|
|
|
| 9″ |
|
|
|
|
| 22.86 cm |
9 | 1 | ⁄2 | ″ | 143⁄16″ | 17⁄8″ Min. |
|
| 4.76 cm | |||
24.13 cm | 36.04 cm | ||||
15⁄16″ |
|
|
|
| |
|
|
|
|
|
2.38 cm Minimum
Clearance
Select appropriate duct
cutout. (See ducting
installation instructions.)
| 43⁄16″ | 10.64 cm |
|
| |||
181⁄2″ |
|
|
|
| Appliance | ||
47 cm |
|
|
|
| |||
|
|
|
| Pressure | |||
Minimum |
|
|
|
| |||
Clearance |
|
|
|
| Regulator | ||
|
|
|
|
|
|
| Grease |
| 2″ |
|
|
|
|
| |
|
|
|
|
|
| Container | |
5.08 cm |
| 141⁄2″ |
| 127⁄8″ | |||
|
|
| |||||
Minimum |
|
|
| 32.7 cm |
| ||
| 36.83 cm |
| |||||
Clearance |
|
|
|
|
|
*Blower may be rotated for horizontal or vertical direction by loosening nuts around blower inlet. Accessible inside ventilation chamber.