GE JGP985 owner manual Installation Instructions, Preparation, 6PREPARE FOR DUCTWORK

Models: JGP985

1 80
Download 80 pages 26.1 Kb
Page 23
Image 23
6PREPARE FOR DUCTWORK

Installation Instructions

PREPARATION

6PREPARE FOR DUCTWORK

NOTE: Ductwork MUST be vented outside. DO NOT vent into a wall, ceiling, crawlspace, attic or any concealed space.

Determine the best route for ductwork; it can be routed in a variety of ways depending on the kitchen layout.

IMPORTANT: The downdraft air discharge outlet for this unit is 3-1/4″ x 10″ rectangular. Plan ducting accordingly.

Typical duct arrangement countertop series.

Outside wall

7BLOWER TO DUCTWORK

ALIGNMENT

In general, the use of flexible ducting is discouraged because it can cause severely restricted airflow. However, if the blower outlet and the floor or wall duct location do NOT align well, then flexible METAL ducting can be used to adapt to an offset. Good alignment without use of flexible ducting is best.

NOTE:

Do not exceed the maximum recommended offset of 6″.

Do not allow the flexible ducting to kink or collapse.

Inside wall

cabinet

cabinet

Do stretch the flexible ducting as much as possible to eliminate as much of the corrugation as possible.

Up inside wall to roof

Directly to outside

or overhang

 

 

Peninsula

Peninsula or island

 

Between floor joists

Through cabinet toe space

Optional duct arrangement under concrete slab.

PVC duct should be used if installing under a poured concrete slab.

NOTE: PVC sewer pipe type PSM 12454-B

Schedule 40 ASTM D1785.

6(15 cm)

3-1/4x 10Rectangular

Dia. 90°

to 6Round Transition

 

Metal Elbow

 

 

 

6 (15 cm)

 

 

Dia. Metal

Wall Cap

Concrete

Duct

6(15 cm) Dia.

Slab

 

Metal Duct

6Max.

Centerline

to Centerline

Offset

Bottom Venting

Back Venting

 

(Requires 314x 10)

A 314″ x 10″ rectangle to 6″ round transition duct is available at your local building supply store.

NOTE: Illustrations are for planning purposes only.

Typical duct arrangement countertop series. 12(30 cm)

Min.

67BLOWER TO DUCTWORKOptional duct arrangement under concrete slab. (15 cm) Manual backgroundManual backgroundManual backgroundManual backgroundManual background Dia. PVCManual backgroundManual background Coupling Manual backgroundManual backgroundManual backgroundManual background

6(15 cm) Dia. PVC Sewer Pipe Elbow

 

 

 

16

6(15 cm)

 

 

 

 

 

 

 

(40.6 cm)

Dia. PVC

 

 

 

 

 

 

 

Max.

Sewer Pipe

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(15 cm)

 

 

 

 

 

 

 

 

 

 

Dia.

 

 

 

 

 

 

 

 

 

 

PVC

 

 

 

 

 

 

 

 

 

 

Coupling

 

 

 

30-0(9.14 m) Max.

 

 

6(15 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dia. PVC

 

 

 

 

 

 

 

 

 

 

Sewer

 

 

 

 

 

 

6(15 cm) Dia.

 

Pipe

Pack tightly with gravel

 

 

 

 

 

 

 

PVC Sewer Pipe

 

 

 

or sand completely

 

 

 

 

 

 

 

Elbow

 

 

 

 

around pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

23

Page 23
Image 23
GE JGP985 owner manual Installation Instructions, Preparation, 6PREPARE FOR DUCTWORK, 7BLOWER TO DUCTWORK ALIGNMENT