Suggested Heat Settings

 

 

 

 

 

Regular

Element

 

 

 

 

 

 

Food

 

 

 

 

 

 

 

 

 

 

 

 

 

Start at Setting

 

Complete at Setting

 

 

Sensi-TempTMElement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rice

 

HI-cover, bring water to

 

LO-2--cover, finish timing

 

 

.4dd rice to water, cover, cook on 200

 

 

 

 

 

a boil.

 

according to package

 

 

according to package directions.

 

 

 

 

 

 

 

 

directions.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chocolate

 

LO-2—allow about 10 to 15

 

 

 

 

 

Minimum-150—allow about 10 to 15

 

 

 

 

 

minutes to melt through,

 

 

 

 

 

minutes to melt through.

 

 

 

 

 

stir to smooth.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Desserts

 

 

 

 

 

 

 

 

 

 

 

 

 

Candy

 

2-3-cook.

 

Follow recipe.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pudding and

 

2-3--cook according to

 

 

 

 

 

Place ingredients in pan and cook following

 

 

Pie Filling

 

package directions.

 

 

 

 

 

package directions on 200.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Eggs

 

 

 

 

 

 

 

 

 

 

 

 

 

Cooked-in-Shell

 

HI—bring water to

 

OFF—time accordingly,

 

 

Heat water on 200, cook 22 to 24 minutes.

 

 

 

 

 

a boil, add eggs.

 

for soft-cooked 3 to 4

 

 

 

 

 

 

 

 

 

 

 

 

 

minutes or hard-cooked

 

 

 

 

 

 

 

 

 

 

 

 

 

15 to 20 minutes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fried, Scrambled

 

HI—melt butter, add eggs.

 

LO—stiming to desired

 

 

Melt butter on 275, then add eggs.

 

 

 

 

 

 

 

 

doneness.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Poached

 

HI—bring water to boil, add

 

LO—finish cooking.

 

 

Heat water on 250, add eggs, cook 3 to 5

 

 

 

 

 

eggs.

 

 

 

 

 

minutes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3auces

 

HI—melt fat.

 

2-3—finish cooking.

 

 

Melt fat and cook on 200.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Soup, Stews

 

HI—heat up liquid.

 

LO—simmer.

 

 

Heat and simmer on 200.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vegetables

 

 

 

 

 

 

 

 

 

 

 

 

 

Fresh

 

HI--cover, bring salted

 

2-3+ook 10-30 minutes,

 

 

Place fresh vegetables in pan with water,

 

 

 

 

 

water to a boil.

 

depending on tenderness

 

 

cover and cook on 200.

 

 

 

 

 

 

 

 

of vegetable.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Frozen

 

HI--cover, bring salted

 

2-3--cook according to time

 

 

Place frozen vegetables in pan with water,

 

 

 

 

 

water and vegetables to a

 

on package.

 

 

cover and cook at 225.

 

 

 

 

 

boil.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fried

 

HI—preheat skillet and oil

 

2-3--cook until desired

 

 

Preheat skillet and oil at 275, add

 

 

 

 

 

or fat,

 

tenderness is reached.

 

 

food and cook until tender.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Deep-Fat Frying

 

HI—heat oil.

 

4-HI—maintain

 

 

Heat oil and fry food at 425-475, use a candy

 

 

 

 

 

 

 

 

temperature.

 

 

thermometer to monitor temperature.

 

 

 

 

 

 

 

 

 

 

 

 

 

h-Pouch

 

HI&cover, bring water

 

3-4—finish timing as

 

 

Bring water to boil and cook at 225-250.

 

 

 

 

 

to a boil.

 

directed on package.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Saute

 

HI—heat oil or melt butter;

 

3-4-cook until desired d

 

 

Heat oil or melt butter on 200, then

 

 

 

 

 

add vegetables.

 

oneness is reached.

 

 

cook vegetables to desired doneness.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: Temperature and time are suggested guidelines only. You may vary them to suit your cooking habits and needs.

9

Page 9
Image 9
GE JP330P warranty Suggested Heat Settings, Directions Chocolate

JP330P specifications

The GE JP330P is a powerful and innovative gas turbine designed for optimized performance in a range of energy generation applications. Known for its high efficiency and reliability, the JP330P leads the way in modern energy solutions, particularly in the realm of combined cycle power plants.

One of the key features of the GE JP330P is its advanced combustion system. This turbine utilizes a dry low NOx (DLN) combustion technology that helps to minimize emissions, making it one of the cleanest gas turbines in its class. The DLN system ensures that nitrogen oxide emissions remain well below regulatory limits, allowing operators to meet stringent environmental standards while delivering efficient power generation.

The JP330P is built with a robust and durable design, featuring high-temperature materials that withstand the extreme conditions found in a gas turbine environment. This ensures not only the longevity of the turbine but also its consistent performance over time. Capacities for the JP330P typically range around 330 megawatts, making it suitable for both peaking and baseload power applications.

In terms of operational flexibility, the JP330P boasts rapid start-up capabilities, reducing the time needed to generate electricity from a cold start. This characteristic is particularly beneficial in balancing power supply in response to fluctuating demand, allowing utilities to efficiently manage their energy outputs.

GE’s Digital Wind Farm technology enhances the operational efficiency of the JP330P by integrating data analytics and advanced monitoring systems. This feature allows plant operators to optimize performance in real-time, reduce downtime, and improve overall reliability through predictive maintenance practices.

The turbine’s modular design also aids in maintenance and operations. With components that can be accessed and replaced with minimal downtime, the JP330P is designed to maximize availability and minimize disruptions.

In summary, the GE JP330P gas turbine is a leading option for energy producers looking for high efficiency, environmental sustainability, and operational flexibility. With its state-of-the-art technologies, durable construction, and advanced combustion system, the JP330P stands out as a robust solution for modern energy challenges, ushering in a new era of reliable power generation.