GE PB3-POS-RP user manual Verify Operation

Models: PB3-POS-RP

1 48
Download 48 pages 1.28 Kb
Page 17
Image 17

17

6)If more than one cash register interface is to be installed repeat steps 1-4 above for each additional cash register.

7)Connect each PB3 unit together by using an RS485 cable with RJ-45 connectors on each end. Connect to either receptacle on Port 0 to interconnect the PB3 units using an “in” and “out” method. (For details on the RS485 cable, review the cable specifications).

Note: The installer shall provide this cable.

8)Confirm that each PB3 has the proper termination setting.

9)Connect the PB3 closest to the DVMRe using the supplied cable from Port 1 (RJ45 outer receptacle) of the PB3 to the RS232/2 port on the DVMRe unit.

Note: Modify the DVMRe’s default baud rate of 19200 to 57600.

10)Supply power to the PB3.

Verify Operation

To verify proper operation process several transactions at the Cash Register.

To verify proper operation with a DVMRe-CT, eZT, or StoreSafe unit:

Select full-screen on the Main Monitor (A) the camera associated with a PB3 unit. Press the camera button until the text box window appears in the display.

The text box will display any transaction data as it is passed to the PB3 unit from the POS device. Be aware that some POS devices only send transaction data until the end of the transaction (when the receipt is printed).

Page 17
Image 17
GE PB3-POS-RP user manual Verify Operation