Installation Preparation
Preparation WITH an Accessory Storage Drawer
NOTE: MODEL ZSC1201 CAN ONLY BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER IF INSTALLED ABOVE
MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL.
PREPARE THE OPENING (cont.)
Installation over another GE/Monogram
PREPARE THE OPENING (cont.)
Installation under a GE/Monogram Microwave Oven and over a Warming
30″
23-1/2″
Drawer:
21″
25-1/4″
Construct Solid Bottom Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides
2″ Min.
(3″ Recommended)
30″
Per Oven Requirement
23-1/2″
Construct Solid Bottom Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides
3.5″ Min.
(4.5″ Recommended)
21″*
*Profile models only
21″*
Per Warming Drawer Requirement
2″ Min.
(3″ Recommended)
*Profile models only
•If you are mounting an
NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth
and height . See Warming Drawer installation instructions for details.
CAUTION:For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate
or a total weight of 130 pounds.
11