Installation Preparation

Preparation WITHOUT an Accessory Storage Drawer

PREPARE THE OPENING

The Advantium 120V can be installed in combination with other GE/Monogram appliances. Always follow each product’s Installation

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram Warming Drawer:

Instructions to complete the installation.

Single Advantium 120V Installation:

Order a 30wide single oven cabinet or cut the opening in a wall to the dimensions shown.

3023-1/2

25-1/4

17-1/2

30

17-1/2

23-1/2

25-1/4

Construct Solid Bottom Min. 3/8Plywood Supported

by 2 x 4 or 2 x 2 Runners all Four Sides

2Min.

(3Recommended)

Per Warming

Drawer

Requirement

Construct Base Min. 3/8Plywood Supported by 2 x 4 or

2 x 2 Runners all Four Sides

Allow 2-1/8case trim overlap on the sides,

1-1/16overlap on the top and 7/8overlap on the bottom of the opening for all models.

Oven overlaps will conceal cut edges on all sides of the opening.

When installed over a single oven or a warming drawer, allow at least 2between the two openings. This separation will provide clearance for bottom overlap of the Advantium 120V and the other appliance overlaps.

Construct a solid oven floor of 3/8min. thick plywood supported by 2 x 4 or 2 x 2 runners on all sides.

The support must be level and rigidly mounted, flush with the bottom edge of the cutout .

NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height . See Warming Drawer installation instructions for details.