GE PSB1200WW, ZSC1201SS, ZSC1202SS Installation Instructions, 1REMOVE THE PACKAGING AND PARTS

Models: PSB1200BB PSB1200WW PSB1201SS ZSC1202SS ZSC1201SS

1 20
Download 20 pages 12.08 Kb
Page 13
Image 13
Installation Instructions

Installation Instructions

1REMOVE THE PACKAGING AND PARTS

Remove all packing material and tape.

Locate parts package containing mounting screws.

Remove the oven from the carton. Do not lift unit by handle or conduit . Two people are required to lift this oven.

Open the door and remove any packaging in oven.

Owner’s

Manual

Rack

1REMOVE THE PACKAGING AND PARTSCAUTION:If installing the Advantium 120V Oven below 36, you must use the plastic bottom trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces.

 

Owner’s Manual

 

 

Installation

 

 

 

 

Instructions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cooking

 

 

 

 

Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cook Book

 

 

 

Cooking Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Glass Tray

 

Turntable Ring

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Metal Trays (2)

Bottom Trim – Plastic

Bottom Trim – Metal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 Brass Screws

 

5 Color-Matched Screws

(3 required, 3 extra)

 

 

(4 required, 1 extra)

 

 

 

 

 

 

 

IMPORTANT: If installing the Advantium 120V Oven with an accessory storage drawer, read the storage drawer assembly instructions to assemble the products together before proceeding to Step 2.

13

Page 13
Image 13
GE PSB1200WW, ZSC1201SS, ZSC1202SS, PSB1201SS, PSB1200BB Installation Instructions, 1REMOVE THE PACKAGING AND PARTS