Installation Preparation

Preparation WITHOUT an Accessory Storage Drawer

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram oven:

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram Oven and Warming Drawer:

30

17-1/2

23-1/2

25-1/4

Construct Solid Bottom Min. 3/8Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides

2Min.

(3Recommended)

Per Oven

Requirement

30

17-1/2

Per Warming Drawer Requirement

23-1/2

25-1/4

Construct Solid Bottom Min. 3/8Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides

2Min.

(3Recommended)

Per Oven

Requirement

2Min.

(3Recommended)

If you are replacing a GE/Monogram electric double oven with the combined installation of an Advantium 120V and a single oven, use

the dimensions shown. The middle rail separating the two openings may need to be larger than the 2minimum shown.

NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth

and height . See Warming Drawer installation instructions for details.

CAUTION:For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate 80-pound oven, plus additional oven loads of up to 50 pounds

or a total weight of 130 pounds.

6

Page 6
Image 6
GE ZSC1202SS, ZSC1201SS Installation over a GE/Monogram oven, Installation over a GE/Monogram Oven and Warming Drawer