Operator's Manual

First Edition · Third Printing

 

 

 

 

FUNCTION TESTS

Test Auxiliary Controls

9Shut the engine off.

10Pull out the red Emergency Stop button to the on position.

11Simultaneously push and hold the auxiliary power button and push each boom function button.

Note: To conserve battery power, test each function through a partial cycle.

Result: All boom functions should operate.

Test the Tilt Sensor

12 Push one of the LCD

screen buttons until

TURNTABLE LEVEL

SENSOR X-DIRECTION appears.

Result: The LCD screen should display the angle in degrees.

13Push one of the LCD screen buttons until

TURNTABLE LEVEL SENSOR Y-DIRECTION appears.

Result: The LCD screen should display the angle in degrees.

14Push one of the LCD screen buttons until

PLATFORM LEVEL SENSOR DEGREES appears.

Result: The LCD screen should display the angle in degrees.

Test the Operating Envelope

15 Push one of the LCD screen buttons shown until PRI BOOM ANGLE is displayed.

16Raise the primary boom and observe the LCD screen.

Result: The primary boom should raise and the LCD screen should display the primary boom angle in degrees from 35 to 68. The primary boom should stop when the screen reads 68 degrees.

17Lower the primary boom.

18Simultaneously push the

LCD screen buttons shown to activate status mode.

19 Push one of the LCD screen

buttons shown until SEC BOOM ANGLE is displayed.

20Push and hold the secondary boom up/extend button.

Result: The secondary boom should raise and the LCD screen should display:

0DEG

>0DEG

AT65DEG

AT 0 FT

>0 FT

>22 FT

The secondary boom should raise and then extend. The secondary boom should not extend until it is fully raised.

21Push and hold the secondary boom down/retract button.

Result: The secondary boom should fully retract and then lower. The secondary boom should not lower unless it is fully retracted.

16

Genie Z-80/60

Part No. 82258

Page 18
Image 18
Genie Z-80, Z-60 manual Test Auxiliary Controls, Test the Tilt Sensor, Test the Operating Envelope