Goodman Mfg SS-CPH90-150 dimensions Roof Curb Installation - Rigging, Product Specifications

Models: SS-CPH90-150

1 36
Download 36 pages 26.92 Kb
Page 26
Image 26
Roof Curb Installation — Rigging

Product Specifications

Roof Curb Installation — Rigging

Provisions for forks have been included in the unit base frame. No other fork locations are approved.

Unit must be lifted by the four lifting holes located at the base frame corners.

Lifting cables should be attached to the unit with shackles.

The distance between the crane hook and the top of the unit must not be less than 60”.

Two spreader bars must span over the unit to prevent damage to the cabinet by the lift cables. Spreader bars must be of sufficient length so that cables do not come in contact with the unit during transport. Remove wood struts mounted beneath unit base frame before setting unit on roof curb. These struts are intended to protect unit base frame from fork lift damage. To remove the struts, extract the sheet metal retainers and pull the struts through the base of the unit. Refer to rigging label on the unit.

Important: If using bottom discharge with roof curb, duct-work should be attached to the curb prior to installing the unit. Duct-work dimensions are shown in Roof Curb Installation Instructions Manual.

Refer to the Roof Curb Installation Instructions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

for proper curb installation. Curbing must

 

 

 

 

 

 

 

 

 

 

 

 

 

 

be installed in compliance with the National

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Roofing Contractors Association Manual.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lower unit carefully onto roof mounting curb.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30”

 

 

 

 

 

 

 

Return

 

 

 

While rigging the unit, the center of gravity will

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

cause the condenser end to be lower than the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Evaporator Coil

supply air end.

 

 

 

 

Compressor 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bring condenser end of unit into alignment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Compressor 2

 

 

 

 

 

 

 

 

 

with the curb. With condenser end of the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Supply

 

unit resting on curb member and using curb

 

 

 

 

 

 

 

 

 

 

 

as a fulcrum, lower opposite end of the unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

until entire unit is seated on the curb. When a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rectangular cantilever curb is used, take care

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to center the unit. Check for proper alignment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and orientation of supply and return openings

 

 

 

 

 

 

 

 

 

 

49”

with duct.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Corner & Center-of-Gravity Locations

Unit Weights

7½-Ton

8½-Ton

10-Ton

12½-Ton

Weights (lbs)

Weights (lbs)

Weights (lbs)

Weights (lbs)

 

 

 

 

 

 

Weight A

285

345

345

435

 

 

 

 

 

Weight B

285

325

325

345

 

 

 

 

 

Weight C

285

320

320

300

 

 

 

 

 

Weight D

285

300

300

240

 

 

 

 

 

Shipping Weight

1175

1310

1310

1350

 

 

 

 

 

Operating Weight

1135

1285

1285

1325

 

 

 

 

 

Note: These weights are calculated without accessories installed.

26

www.goodmanmfg.com

SS-CPH90-150

Page 26
Image 26
Goodman Mfg SS-CPH90-150 dimensions Roof Curb Installation - Rigging, Product Specifications

FAQ

What are the lifting requirements for the SS-CPH90-150 Air Conditioner?

The unit must be lifted by the four lifting holes located at the base frame corners, with the lifting cables attached to the unit with shackles. The distance between the crane hook and the top of the unit must not be less than 60 inches.

What should be done before setting the unit on the roof curb?

Wood struts mounted beneath the unit base frame should be removed to prevent damage to the unit base frame by a forklift. To remove the struts, extract the sheet metal retainers and pull the struts through the base of the unit.

Is duct-work required for bottom discharge with roof curb installation?

Yes, duct-work should be attached to the curb prior to installing the unit.