Goodman Mfg VC8 instruction manual Table of Contents

Models: VC8

1 48
Download 48 pages 50.02 Kb
Page 2
Image 2

Table of Contents

 

SAFETY PRECAUTIONS

4

ADDITIONAL SAFETY CONSIDERATIONS

5

SHIPPING INSPECTION

5

ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS

5

TO THE INSTALLER

5

IMPORTANT NOTE TO THE OWNER REGARDING PRODUCT WARRANTY

5

PRODUCT DESCRIPTION

6

FEATURES

6

PRODUCT APPLICATION

6

LOCATION REQUIREMENTS AND CONSIDERATIONS

7

CLEARANCES AND ACCESSIBILITY

8

HORIZONTAL INSTALLATION (*MVC8 MODELS ONLY)

8

FURNACE SUSPENSION

8

EXISTING FURNACE REMOVAL

8

THERMOSTAT LOCATION

9

COMBUSTION AND VENTILATION AIR REQUIREMENTS

9

CATEGORY I VENTING (VERTICAL VENTING)

10

EXTERIOR MASONRY CHIMNEYS (CATEGORY I FURNACES ONLY)

11

CHECKLIST SUMMARY

11

CHECK 1 - PROPER CHIMNEY TERMINATION

12

CHECK 2 - ANY SOLID OR LIQUID FUEL APPLIANCES VENTED INTO THIS CHIMNEY CHANNEL

12

CHECK 3 - CHIMNEY CROWN CONDITION

13

CHECK 4 - DEBRIS IN CLEANOUT

13

CHECK 5 - LINER CONDITION

13

CHECK 6 - DILUTION AIR

13

CHECK 7 - COMPLETE THE INSTALLATION

13

FIX 1 - LINER TERMINATION

14

FIX 2 -CHANGEVENTING ARRANGEMENTS

14

FIX 3 - REBUILD THE CROWN

14

FIX 4 - RELINING

14

ELECTRICAL CONNECTIONS

15

WIRING HARNESS

15

115 VOLT LINE CONNECTIONS

15

JUNCTION BOX RELOCATION

16

24 VOLT THERMOSTAT WIRING

16

SINGLE-STAGEHEATING THERMOSTAT APPLICATION

17

24 VOLT DEHUMIDISTAT WIRING

17

FOSSIL FUEL APPLICATIONS

17

115 VOLT LINE CONNECTION OF ACCESSORIES (HUMIDIFIER AND ELECTRONIC AIR CLEANER)

18

24 VOLT HUMIDIFIER

18

GAS SUPPLY AND PIPING

18

HIGH ALTITUDE DERATE

18

PROPANE GAS CONVERSION

18

GAS PIPING CONNECTIONS

18

UPFLOW INSTALLATIONS

20

COUNTERFLOW INSTALLATIONS

20

GAS PIPING CHECKS

20

PROPANE GAS TANKS AND PIPING

21

CIRCULATING AIR AND FILTERS

21

CHECKING DUCT STATIC

22

FILTERS - READ THIS SECTION BEFORE INSTALLING THE RETURN AIR DUCTWORK

22

UPRIGHT INSTALLATIONS

23

2

Page 2
Image 2
Goodman Mfg VC8 instruction manual Table of Contents