OPERATIONAL CHECKS & SAFETY CIRCUIT DESCRIPTION
LED | LED | Indication | Possible Causes | Corrective Action(s) | Notes & Cautions |
| Status |
|
|
|
|
| Off | ξ Normal condition | ξ None | ξ None | ξ None |
| 1 Flash | ξ Communications | ξ Communications | ξ Depress Learn Button | ξ Depress once |
|
| Failure | Failure | ξ Verify that bus BIAS | quickly for a power- |
Red |
|
|
| and TERM | up reset |
|
|
| dipswitches are in the | ξ Depress and hold | |
Communications |
|
|
| ||
|
|
| ON position. | for 2 seconds for | |
LED |
|
|
| ||
|
|
|
| an | |
|
|
|
|
| |
| 2 Flashes | ξ | ξ Control power up | ξ None | ξ None |
|
|
| ξ Learn button |
|
|
|
|
| depressed |
|
|
| Off | ξ No power | ξ No power to furnace | ξ Check fuses and | ξ Turn power OFF |
|
| ξ Communications | ξ Open fuse | circuit breakers; | prior to repair |
|
| error | ξ Communications error | replace/reset |
|
|
|
|
| ξ Replace blown fuse |
|
|
|
|
| ξ Check for shorts in |
|
|
|
|
| low voltage wiring in |
|
|
|
|
| furnace/system |
|
|
|
|
| ξ Reset network by |
|
|
|
|
| depressing learn |
|
|
|
|
| button |
|
|
|
|
| ξ Check data 1/ data 2 |
|
|
|
|
| voltages |
|
| 1 Steady | ξ No network found | ξ Broken/ disconnected | ξ Check | ξ Turn power OFF |
| Flash |
| data wire(s) | communications | prior to repair |
|
|
| ξ Furnace is installed as | wiring (data 1/ data 2 | ξ Verify wires at |
|
|
| a legacy/ traditional | wires) | terminal blocks are |
|
|
| system | ξ Check wire | securely twisted |
Green Receive |
|
|
| connections at | together prior to |
|
|
| terminal block | inserting into | |
LED |
|
|
| ξ Verify furnace | terminal block |
|
|
|
| installation type | ξ Verify data1 and |
|
|
|
| (legacy/ traditional or | data voltages as |
|
|
|
| communicating) | described above |
|
|
|
| ξ Check data 1/ data 2 |
|
|
|
|
| voltages |
|
| Rapid | ξ Normal network | ξ Control is “talking” on | ξ None | ξ None |
| Flashing | traffic | network as expected |
|
|
| On Solid | ξ Data 1/ Data 2 | ξ Data 1 and data 2 | ξ Check | ξ Turn power OFF |
|
| wires reversed at | communications | prior to repair | |
|
|
| furnace, thermostat, | wiring (data 1/ data 2 | ξ Verify wires at |
|
|
| or CT™ compatible | wires) | terminal blocks are |
|
|
| outdoor AC/HP | ξ Check wire | securely twisted |
|
|
| ξ Short between data 1 | connections at | together prior to |
|
|
| and data 2 wires | terminal block | inserting into |
|
|
| ξ Short between data 1 | ξ Check data 1/ data 2 | terminal block |
|
|
| or data 2 wires and R | voltages | ξ Verify data1 and |
|
|
| (24VAC) or C (24VAC |
| data voltages as |
|
|
| common) |
| described above |
NORMAL SEQUENCE OF OPERATION
POWER UP
The normal power up sequence is as follows:
•115 VAC power applied to furnace.
•Integrated control module performs internal checks.
•Integrated control module displays 88 on dual
•Integrated control module monitors safety circuits continuously.
•Furnace awaits call from thermostat. Dual
HEATING MODE
The normal operational sequence in heating mode is as fol- lows:
•R and W1 (or R and W1/W2) thermostat contacts close, initiating a call for heat.
•Integrated control module performs safety circuit checks.
•Induced draft blower is energized on high speed for a 15- second prepurge. Humidifier terminal is energized with induced draft blower.
•Induced draft blower steps to low speed following prepurge. Low stage pressure switch contacts are closed.
•Igniter warm up begins upon step to low speed and presence of closed low stage pressure switch contacts.
34