Installation

4. Connect the Power Leads.

Label “A” and “B” leads for identification in step 10. Route all the wires through the conduit when connections are complete.

- (3) “A” Leads

-(2) “B” Leads

5.Mount the RTD.

Route the wire through the conduit when connections are complete.

-(1) RTD

-(1) Washer

- (1) M5 Screw

8

332511A

Page 8
Image 8
Graco 24R200 operation manual Connect the Power Leads, Mount the RTD