Graco 24R200 operation manual Connect the Ground Wires

Models: 24R200

1 28
Download 28 pages 39.66 Kb
Page 7
Image 7
3.Connect the Ground Wires.

Installation

2. Install the Heat Coils and the Thermostat Switch.

- (1) Thermostat

- (2) Washers

- (2) Screws

- (6) 1/4-20 Studs

- (6) Flat Washers

-(6) Lock Washers

-(6) Nuts

3.Connect the Ground Wires.

Connect the ground wires to the terminal lug and to the platen covers (not shown in view). Attach the conduit to the platen cover and route the wires through the conduit when connections are complete.

- (3) Ground Wires Manual backgroundManual background

- (2) Lock Washers

- (2) Nuts

- (1) Terminal Lug

332511A

7

Page 7
Image 7
Graco 24R200 operation manual Connect the Ground Wires