Part #470655 Motor Overamps, Troubleshooting, Reference Blower Start-Up- Step #5
Models:
Part #470655
1
18
32
32
Download
32 pages
30.25 Kb
15
16
17
18
19
20
21
22
Troubleshooting
Install
Flame Signal Check
Without 7-DayTimer
Uncross wires and reconnect
Warranty
Maintenance
Correct gas pressure and reset
Wire Accessories
Adjust drives as needed
Page 18
Image 18
Page 17
Page 19
Page 18
Image 18
Page 17
Page 19
Contents
If you smell gas 1.Open windows
General Safety Information
2.Do not touch electrical switches
3.Extinguish any open flame
Unpacking
Inspection and Maintenance during Storage
Receiving
Handling
Installation
Table of Contents
Clearance to Combustibles / Service Clearances
Troubleshooting
2. Install Unit
Installation of Indoor Unit
1. Install Hangers
3. Seal Wall Opening
2. Install Ductwork
Installation of Arrangement DB / HZ
1.Install Curb and/or Equipment Supports
4. Install Unit
2. Install TSCP
Installation of Diffuser and Remote Panel TSCP
1. Install Diffuser
Airflow
3.Connect the Main Power
Installation of Electrical Wiring
1.Determine the Size of the Main Power Lines
4. Wire the Optional Convenience Outlet
1.Determine the Supply Gas Requirements
Installation of Gas Piping
2.Install Additional Regulator if Required
3. Connect the Supply Gas Line
5. Test the System for Leaks
Start-Up- Blower
4. Pipe the Optional Vent Line
Pre Start-UpCheck
3. Check for Vibration
5.Air Volume Measurement and Check
2.Check the Blower Rotation
4. Motor Check
1. Check the Supply Gas Pressure
Start-UpDirect Gas
Start-UpDirect Gas • 100% Outside Air
4a. Set the Burner Air Pressure Differential
5. Set the Low Fire Time Delay
Start-UpDirect Gas 50/50 Recirculation
4b. Set the Burner Air Pressure Differential
6. Set the Maximum Firing Rate
7. Set the Minimum Firing Rate
Start-UpDirect Gas continued
Regulators and Modulating Valves
8. Set Daytime Temperature
10.Program the 7 Day Time Clock
11.Flame Signal Check
9. Set Nighttime Temperature
Flame Signal Check
2.Switch S2 in Winter Mode
Without 7-DayTimer
1.Switch S2 in Summer Mode
3.Flame Safeguard FSG Sequence
2.Switch S2 in Winter Mode
Operation - Electrical Sequence With 7-DayTimer
1.Switch S2 in Summer Mode
3.Flame Safeguard FSG Sequence
Turn Supply Switch S2 On
Troubleshooting
Blower Does Not Operate
Reset
Reference Blower Start-Up- Step #5
Motor Overamps
Troubleshooting
Reference Blower Start-Up- Step #2
Troubleshooting
Insufficient Airflow
Too Much Airflow
Reference Filters in the Maintenance section
Excessive Noise or Vibration
Troubleshooting
Reference Bearings in the Maintenance section
Turn Heat Switch S4 On
Heater Does Not Operate
Troubleshooting
Wire Heat Switch S4
If problems remain, consult the factory
Troubleshooting
Uncross wires and reconnect
Heater Does Not Operate
Heater Does Not Operate
Troubleshooting
Adjust drives as needed
Reference Direct Gas Start-Up- Step #11
Motors
Maintenance - Routine
Snow Accumulation
Wheels
Bearings
Filters
Burner
Maintenance - Fall
High Limit
Gas Train
Reference
Typical Gas Train Layout 400 – 800 MBH
DGX Industrial Space Heating
Reference
Dirty Filter Switch
Typical Control Center Layout
28 DGX Industrial Space Heating
Typical setting varies
Start-UpChecklist
Typical setting 5 minutes 45ºF