3.5 INSTALLATION CHECKLIST

Section 3 – Post-Installation Start-up Adjustments

Recreational Vehicle Generator

3.5 INSTALLATION CHECKLIST

‹EXHAUST SYSTEM

‹ LOCATION AND SUPPORT

Exhaust system complies with all applicable

codes.

Generator is properly located.

Exhaust system is properly and safely installed.

Generator is properly supported.

Generator is properly restrained.

‹GENERATOR COMPARTMENT

Compartment construction is proper.

Holes/Openings are vapor-sealed.

Compartment size is correct.

Compartment is vapor-sealed.

Sound insulation is correct.

Floor cutouts are properly completed.

‹COOLING AND VENTILATING AIR

Airflow is adequate.

Air inlet opening is correct.

Compensate for restrictions.

Check that installation has been tested.

‹GASOLINE FUEL SYSTEM

Fuel tank complies with all applicable codes.

Fuel system is properly installed and checked for leaks.

‹OPTIONAL LP GAS FUEL SYSTEM

Fuel system is properly installed and checked for leaks.

Pressure at regulator inlet is correct.

Rated flow of primary regulator is correct.

All parts are properly installed.

Fuel system is properly tested/adjusted.

‹ELECTRICAL CONNECTIONS

Connections comply with local code requirements and all National Electrical Codes.

Junction box is properly installed.

Wiring meets all standards.

All connections are correct.

Conduit is properly installed and sealed.

Generator is properly bonded to the vehicle.

‹BATTERY INSTALLATION

Recommended battery is installed.

Recommended cables are installed.

Cables are clean and tight.

Cables are connected properly.

Proper ventilation is provided.

Terminals are coated with anti-corrosion grease, and terminal covers are positioned.

‹OPTIONAL ACCESSORIES

Check that remote start/stop panels (if used) are installed properly.

Check that hourmeter kit (if used) is installed properly.

Check that any other options and accessories (if used) are installed properly.

‹POST INSTALLATION TESTS

Check that all tests are completed properly.

DATE OF INSTALLATION ____________________________________________________

NAME OF INSTALLER_______________________________________________________

SIGNATURE OF INSTALLER _________________________________________________