UNPACKING THE AIR CONDITIONER

ENGLISH

UNPACKING THE AIR CONDITIONER

WARNING

EXCESSIVE WEIGHT HAZARD

When moving or lifting the air conditioner, use two or more people. Wear gloves when handling the air conditioner to protect against possible sharp edges and metal fins.

REMOVE PACKAGING MATERIALS

Remove packaging materials. Save the carton and the foam packaging for storing the unit when not in use.

NOTE: There are NO internal packing materials inside the air conditioner to remove―Do Not open the cabinet.

Handle the air conditioner gently.

Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back or upside down.

The air conditioner must be standing upright for 2 hours prior to installation and operation.

PREPARING THE AIR CONDITIONER

INSTALL TOP CHANNEL

Fig. 7

 

Front

3/8" Screw

Top Channel

1. Place the top channel on the top of the air conditioner, lining up the holes in the top channel with the holes in the top of the unit. Make sure the channel is facing forward as indicated by the sticker. (See Fig.7)

2. Using 3/8" self-tapping screws, attach the top channel to the top

of the air conditioner. (See Fig.8)

Fig. 8

Use four (4) 3/8" self-tapping screws for models:

 

HWE10XCN

HWE12XCN

 

 

Use three (3) 3/8" self-tapping screws for models:

 

HWR05XCM

HWE06XCN

HWE08XCN

 

PAGE 10

HOW TO INSTALL

Page 12
Image 12
Haier HWE10XCN Unpacking The Air Conditioner, Preparing The Air Conditioner, Excessive Weight Hazard, Install Top Channel