LIFT PREPARATION
AL010/050 and AL030 PIVOT POINT ADJUSTMENTS
|
|
| N |
|
| IO | |
| NS |
| |
| STTE |
|
|
JU |
|
| |
AD |
|
|
|
The hinge points are equipped with tensioning washers. The amount of force required to move these parts is determined by the t e n s i o n o f t h e s e w a s h e r s . To adjust, simply loosen or tighten the bolt and nut located by w/ arrows. The tension is set at the factory and should need no adjustment . This is noted for reference only.
|
|
| N |
|
| IO | |
| NS |
| |
| STTE |
|
|
JU |
|
| |
AD |
|
|
|
TENSION
ADJUST
Al030 HOLD DOWN ARM ADJUSTMENT
nuts | here |
Loosen
arm Slide
Tighten
up | or |
| |
after |
tube down adjustment
LIFT SHOULD HOLD WHEELCHAIR FIRMLYWITH THE PLATFORM FULLY RAISED( RAISED UNTILMOTOR RATCHETING IS HEARD )
12