OPERATION

AL 010 / 050

LOADING A SCOOTER

"PLATFORM KEEPER"

UP

DOWN

ON

WELDED

 

PLATFORM

 

TO

1 Insert Key and switch to "ON" position

2 Once platform has been lowered at least an

Press down on Toggle switch momentarily.

inch, unfold the platform. Continue lowering

 

to the ground.

Rear Wheels in Craddle

PUSH to

RELEASE

PULL to

TIGHTEN

3Drive scooter onto platform as shown.

5Raise platform until hold down foot depresses scooter's deck or until lift's motor ratchets.

20

4Strap the scooter down using the 4 straps located on each corner of the platform.

To remove the scooter and prepare the lift for unloaded travel, follow above steps in reverse order and reverse the direction of the arrows.

Lift should be raised

 

 

 

 

 

 

with the platform folded

 

 

 

KEE

PER

and until the lift's motor

PL

 

 

 

 

ATF

ORM

 

 

 

 

 

 

 

 

 

 

 

 

ratchets. Verify that the

 

 

 

 

 

 

platform keeper has

 

 

 

ATFORM's

 

engaged the platform's

 

 

PL

 

 

 

 

 

 

 

pin.

 

 

 

 

 

PIN