Manuals
/
Hearth and Home Technologies
/
Kitchen Appliance
/
Egg Cooker
Hearth and Home Technologies
BH 105 manual
Models:
BH 105
1
2
49
49
Download
49 pages
25.25 Kb
1
2
3
4
5
6
7
8
<
>
Troubleshooting
Specifications
Install
Pellet Boiler Wiring Diagram
Warranty
Maintenance
NOTE Pellet Boiler Outdoor Air Reset Operation Graph located on page
Assembly
Turn Feed Adjuster to #4
Power Failure Backup Supply
Page 2
Image 2
Page 1
Page 3
Page 2
Image 2
Page 1
Page 3
Contents
The BH 105 Pellet Boiler
Installation & Operating Manual
SAFETY NOTICE
save these instructions
Page
Parts Locations
SAVE THESE INSTRUCTIONS
Please read this entire manual before you install and use your new
Introduction
Table Of Contents
Warranty
ECO-CHOICE LIMITED WARRANTY
Assembly
Boiler Kit Materials Refer to page
Floor Protection
Assembly
Design
NOTE All installation clearances and restrictions must be adhered to
Assembly
INSTALLATION IS TO BE PERFORMED BY A QUALIFIED INSTALLER
Venting
Venting
Avoid venting into alcove locations
Ventingti g
NOTE All installation clearances and restrictions must be adhered to
Venting Installation
INSTALLATION IS TO BE PERFORMED BY A QUALIFIED INSTALLER
Keep combustibles away from flue outlet
Heat Reclaiming Ventilation System HRV
Installation
Outside Air
NOTE The inlet cover should not be placed in an
Main Wiring Installation
InstallingInstallationDuct
Installing Duct/AirInstallationConditioning
EXAMPLE OF TYPICAL TANKLESS DOMESTIC HOT WATER PIPING
Installation
RECOMMENDED INSTALLATION INSTRUCTIONS FOR THE PROPER
EXAMPLES OF TYPICAL DOMESTIC HOT WATER STORAGE PIPING
SHUT-OFF VALVE
Installation
SENSING BULB
AIR SCOOP
Installation
A POWER FAILURE HEAT DISSIPATION LOOP
Over Heat Safety Zone
Power Failure / Heat Dissipation Loop
EXAMPLE OF PIPING IN ACCORDANCE WITH CAN/CSA-B366.1
Firebox Door
The Control
Installation
Fuel Specifications
Fuel and Fuel Storage
Operation
Max Temp dial
Without the Outdoor Air Temperature Sensor Installed
WATER TEMPERATURE
NOTE Pellet Boiler Outdoor Air Reset Operation Graph located on page
Operation
Pellet Boiler Outdoor Air Reset Operation
Operation
Starting A Fire Automatically
1. Turn Mode Selector to “OFF”
Operation
6. Flip the Igniter Switch up into the “AUTO” position
WATER TEMPERATURE
5. Turn Feed Adjuster to #4
Operation
Lighting A Fire Manually
Operation
9. Fill hopper with pellets and remove ashes as required Type of Fuel
Follow steps 1 through 5 of the instructions for automatic lighting
12. Light The Starting Gel With A Match 13. Close The Doors
Operation
11. Apply starting gel as shown in Fig.15
Cleano ut cover
Maintenance
Burnpot Cleaning
Cleaning the Burnpot Air Chamber
Warning! Risk of Fire
Maintenance
Routine cleaning of heat exchangers and venting is required
Ash, soot or creosote build-up may cause overheating or fire
Maintenance
Cleaning Steps
Cleaning the Tube Heat Exchangers
Maintenance
Combustion Blower Cleaning
Fuel
Troubleshooting
Helpful Hints
Cleaning Burn Pot
Atmospheric Conversion
bh105
Stocked
#8 Ash base Assembly
bh105
1-00-72210
Cleanout Rod Repair Kit
bh105
Scraper Rod Guide
28.1
#28 Feeder Assembly
bh105
28.16
#30 water Plate Kit
bh105
#29 boiler Kit
#31 handle Kit
Screw, #8-18 x 1/2 Hex washer Head Self Drilling Zinc #2 Pt
bh105
Stocked
washer, #10-16 x 3/4 hex head TEKS 3 SdS Climaseal Plated
Electrical 120 VAC 60 Hz
Specifications
BTU Input Range= 0, and 9350 to 113,900
PELLET BOILER WIRING DIAGRAM
Diagram
Wiring
Ready mode
Power Failure Backup Supply
When current is present, will keep UPS in
POWER FROM THE UPS / This plugs
BH105
Testing Label
BH105
WARNING Risk of fire - Do not operate with the flue draft
Description Of Service
Service Record / Notes
Date Of Service
Performed By
Proudly Printed On 100% Recycled Paper
1 Turn Mode Selector to OFF
See the section on Maintenance for more details about cleaning
Quick Reference Auto-Light
2 Use heat exchanger cleanout rods to clean the heat exchanger tubes
Signature of Boxer