Manuals
/
Hearth and Home Technologies
/
Kitchen Appliance
/
Egg Cooker
Hearth and Home Technologies
BH 105 manual Proudly Printed On 100% Recycled Paper
Models:
BH 105
1
47
49
49
Download
49 pages
25.25 Kb
42
43
44
45
46
47
48
49
<
>
Troubleshooting
Specifications
Install
Pellet Boiler Wiring Diagram
Warranty
Maintenance
Assembly
Turn Feed Adjuster to #4
Cleaning Steps
Testing Label
Page 47
Image 47
Proudly Printed On 100% Recycled Paper
47
Page 46
Page 48
Page 47
Image 47
Page 46
Page 48
Contents
save these instructions
Installation & Operating Manual
SAFETY NOTICE
The BH 105 Pellet Boiler
Page
Parts Locations
Table Of Contents
Please read this entire manual before you install and use your new
Introduction
SAVE THESE INSTRUCTIONS
ECO-CHOICE LIMITED WARRANTY
Warranty
Boiler Kit Materials Refer to page
Assembly
Floor Protection
Assembly
Design
NOTE All installation clearances and restrictions must be adhered to
Assembly
INSTALLATION IS TO BE PERFORMED BY A QUALIFIED INSTALLER
Venting
Avoid venting into alcove locations
Venting
Ventingti g
Keep combustibles away from flue outlet
Venting Installation
INSTALLATION IS TO BE PERFORMED BY A QUALIFIED INSTALLER
NOTE All installation clearances and restrictions must be adhered to
NOTE The inlet cover should not be placed in an
Installation
Outside Air
Heat Reclaiming Ventilation System HRV
Main Wiring Installation
InstallingInstallationDuct
Installing Duct/AirInstallationConditioning
EXAMPLES OF TYPICAL DOMESTIC HOT WATER STORAGE PIPING
Installation
RECOMMENDED INSTALLATION INSTRUCTIONS FOR THE PROPER
EXAMPLE OF TYPICAL TANKLESS DOMESTIC HOT WATER PIPING
AIR SCOOP
Installation
SENSING BULB
SHUT-OFF VALVE
Installation
EXAMPLE OF PIPING IN ACCORDANCE WITH CAN/CSA-B366.1
Over Heat Safety Zone
Power Failure / Heat Dissipation Loop
A POWER FAILURE HEAT DISSIPATION LOOP
Firebox Door
The Control
Installation
Fuel and Fuel Storage
Fuel Specifications
Max Temp dial
Operation
MAX. TEMP
NOTE Pellet Boiler Outdoor Air Reset Operation Graph located on page
Operation
WATER TEMPERATURE
Operation
Pellet Boiler Outdoor Air Reset Operation
1. Turn Mode Selector to “OFF”
Operation
Starting A Fire Automatically
WATER TEMPERATURE
5. Turn Feed Adjuster to #4
6. Flip the Igniter Switch up into the “AUTO” position
Operation
Follow steps 1 through 5 of the instructions for automatic lighting
Operation
9. Fill hopper with pellets and remove ashes as required Type of Fuel
Lighting A Fire Manually
12. Light The Starting Gel With A Match 13. Close The Doors
Operation
11. Apply starting gel as shown in Fig.15
Cleaning the Burnpot Air Chamber
Maintenance
Burnpot Cleaning
Cleano ut cover
Ash, soot or creosote build-up may cause overheating or fire
Maintenance
Routine cleaning of heat exchangers and venting is required
Warning! Risk of Fire
Cleaning Steps
Maintenance
Cleaning the Tube Heat Exchangers
Maintenance
Combustion Blower Cleaning
Cleaning Burn Pot
Troubleshooting
Helpful Hints
Fuel
Atmospheric Conversion
Stocked
bh105
bh105
#8 Ash base Assembly
Scraper Rod Guide
Cleanout Rod Repair Kit
bh105
1-00-72210
28.16
#28 Feeder Assembly
bh105
28.1
#31 handle Kit
bh105
#29 boiler Kit
#30 water Plate Kit
washer, #10-16 x 3/4 hex head TEKS 3 SdS Climaseal Plated
bh105
Stocked
Screw, #8-18 x 1/2 Hex washer Head Self Drilling Zinc #2 Pt
Electrical 120 VAC 60 Hz
Specifications
BTU Input Range= 0, and 9350 to 113,900
PELLET BOILER WIRING DIAGRAM
Diagram
Wiring
into the UPS. When power fails, UPS
Power Failure Backup Supply
When current is present, will keep UPS in
POWER FROM THE UPS / This plugs
WARNING Risk of fire - Do not operate with the flue draft
Testing Label
BH105
BH105
Performed By
Service Record / Notes
Date Of Service
Description Of Service
Proudly Printed On 100% Recycled Paper
5 Turn Feed Adjuster to “Test”
See the section on Maintenance for more details about cleaning
Quick Reference Auto-Light
2 Use heat exchanger cleanout rods to clean the heat exchanger tubes
Signature of Boxer