Heat & Glo • SL-350TRS-CE-D • 2033-900 Rev. N • 10/07 27
!
FIGURE 34. Venting through the Wall
EXTERIOR
INTERIOR
Interior
Wall Shield
Inner Flue
Rear Vent
Heat Shield
38mm min.
overlap
Outer Flue
38mm min.
Overlap
The heat shield sections will overlap to match the wall
thickness (depth). The small leg in the shield rests on
top of the flue to properly space it from the pipe section
(see Figure 34).
The termination kit should pass through the wall
firestops from the exterior of the building.
Adjust the termination cap to its final exterior position
on the building and interlock the flue sections.
WARNING: THE TERMINATION CAP
MUST BE POSITIONED SO THAT THE
ARROW IS POINTING UP.
Use a high-temperature sealant gasket to seal between
the pipe and exterior firestop.
For Horizontal Terminations using the SLK-01DA
To attach and secure the termination to the last section of
horizontal flue:
!
Rotate and interlock the ends as described at the begin-
ning of the Installing Flue Components section.
The termination kit should pass through the wall
firestops from the exterior of the building.
Adjust the termination cap to its final exterior position
on the building.
WARNING: THE TERMINATION CAP MUST BE
POSITIONED SO THAT THE ARROW IS
POINTING UP.
Use the exterior pipelock hole provided on the round
flange of the wall firestop to secure the flue pipe in place.
Use a high-temperature sealant or fiberglass rope gas-
ket to seal between the pipe and exterior firestop.
See Figure 37 for flue termination clearances.