Hearth and Home Technologies SL-550TV-IPI-E Termination Locations, 2 Staggered Termination Caps

Models: SL-950TV-IPI-E SL-550TV-IPI-E SL-750TV-IPI-E

1 48
Download 48 pages 49.26 Kb
Page 22
Image 22
6 Termination Locations

6 Termination Locations

A. Vent Termination Minimum Clearances

A. Vent Termination Minimum Clearances WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

B-VENT GAS, WOOD OR FUEL

OIL TERMINATION

B

C

A

GAS

TERMINATION

LISTED B-VENT TERMINATION CAP

8 FEET

VERTICAL

 

WALL

LOWEST

DISCHARGE

OPENING

X

12

Fire Risk. ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

 

Gas

Wood & Fuel Oil

Comments

 

Termination

Termination

 

 

 

 

 

 

A

6 in.

20 in. min.

Horizontal distance between terminations

 

 

 

 

B

8 ft.

8 ft. min.

Distance to perpendicular wall

 

 

 

 

C

18 in.

18 in.

Vertical distance between terminations

 

 

 

 

Figure 6.2 Staggered Termination Caps

B-VENT GAS, WOOD OR FUEL

OIL TERMINATION

 

 

8 FT.

 

 

(2.4 M)

 

 

(MINIMUM) TO

 

20 IN. MIN. *

PERPENDICULAR

WOOD OR

WALL

(508 MM)

GAS TERMINATION

(GAS ONLY)

 

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 6.1 Minimum Height From Roof To Lowest Discharge Opening

*IF USING DECORATIVE CAP COVER(S), THIS DISTANCE MAY NEED TO BE INCREASED. REFER TO THE INSTALLATION INSTRUCTIONS SUPPLIED WITH THE DECORATIVE CAP COVER.

Figure 6.3 Leveled Termination Caps

22

Heat & Glo • SL-550 / 750 / 950TV-IPI-E2119-900 Rev. H • 11/08

Page 22
Image 22
Hearth and Home Technologies SL-550TV-IPI-E Termination Locations, A. Vent Termination Minimum Clearances, Roof Pitch