Step 10. Installing Trim, Logs and
Ember Material
Installing the Trim
Combustible materials may be brought up to the specified clearances on the side and top front edges of the fireplace, but MUST NEVER overlap onto the front face. The joints between the finished wall and the fireplace top and sides can only be sealed with a 300° F. (149° C) minimum sealant.
Install optional marble and brass trim surround kits as desired. Marble, brass, brick, tile, or other
Positioning the Logs
If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the instructions that accompany the logs. Save the log instructions with this manual.
If sooting occurs, the logs might need to be repositioned slightly to avoid excessive flame impingement.
Placing the Rock
A bag of rock is shipped with this fireplace. Refer to the placement instructions on the back of the log placement instructions.
Placing the Ember Material
Ember material is shipped with this gas fireplace. The bag labeled Glowing Ember
•Pull the six glass latches out of the groove on the glass frame. Remove the front trim door and the glass door from the unit.
•Cover the top of the burner with a single layer of ember material. For best performance do not place embers di- rectly on the ports. Save the remaining ember materials for use during fireplace servicing.
•Replace the glass door and a front trim door on the unit (see Service Parts List of this manual.)
•Pull out and latch the glass clips into the groove on the glass frame.
LATCHES |
|
GLASS |
|
ASSEMBLY |
|
Figure 26. Glass Assembly | |
Glass Specifications: | CERAMIC |
EMBER
MATERIAL
Figure 27. Placement of the Ember Material
Heat & Glo • Everest • | 25 |