Heat & Glo LifeStyle EVEREST manual 3Installing the Fireplace, Locating the Fireplace, Inches

Models: EVEREST

1 27
Download 27 pages 12.36 Kb
Page 9
Image 9
3Installing the Fireplace

3Installing the Fireplace

Step 1. Locating the Fireplace

The diagram below shows space and clearance require- ments for locating a fireplace within a room.

 

4” (102mm)

 

 

 

 

 

 

B

 

A

 

 

 

 

 

 

E

D

 

 

 

 

 

 

 

 

C

 

 

 

1/2” (13mm)

A

B

C

D

E

35 1/2”

21 3/4”

30 1/2”

43 1/4”

61 3/16”

(902mm)

(552mm)

(775mm)

(1099mm)

(1554mm)

Figure 2. Fireplace Dimensions, Locations,

 

and Space Requirements

 

Clearance Requirements

The top, back, and sides of the fireplace are defined by stand-offs. The minimum clearance to a perpendicular wall extending past the face of the fireplace is 4 inches (102mm). The back of the fireplace may be recessed 23 (584mm) inches (546mm) into combustible construction.

Minimum Clearances

from the Fireplace to Combustible Materials

Minimum Clearances

from the Vent Pipe to Combustible Materials

 

Inches

mm

Vertical Sections

1

25

Horizontal Sections

 

 

Top

3

75

Bottom

1

25

Sides

1

25

At Wall Firestops

 

 

Top

3

76

Bottom

1

25

Sides

1

25

For minimum clearances, see the direct vent termination clearance diagrams on pages 20 and 21 in this manual.

The distance from the unit to combustible construction is to be measured from the unit outer wrap surface to the combustible construction, NOT from the screw heads that secure the unit together.

Step 2. Framing the Fireplace

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommo- date wall coverings and fireplace facing material. The dia- gram below shows framing reference dimensions.

CAUTION: MEASURE FIREPLACE DIMENSIONS, AND VERIFY FRAMING METHODS AND WALL COVERING DETAILS, BEFORE FRAMING.

Shows center of

10” x 12” vent framing

holes for venting.

D

 

Inches

mm

Glass Front

........................ 36

914

Floor

0

0

Rear

1/2

13

Sides

1/2

13

Top

4 1/2

114

Ceiling*

31

787

* The clearance to the ceiling is measured from the

top of the unit, excluding the stand-offs and collar.

Framing should be constructed of 2 X 4 lumber or heavier.

A

35 1/8”

(892mm)

B

50 1/2”

(1283mm)

C

21 3/8”

(542mm)

D

55 1/2”

(1372mm)

(Center of 12 x 10)

BC

A

See Figure 24 for further details.

Figure 3. Framing Dimensions

Heat & Glo • Everest • 750-900 Rev. L • 1/06

9

Page 9
Image 9
Heat & Glo LifeStyle EVEREST 3Installing the Fireplace, Locating the Fireplace, Clearance Requirements, Minimum Clearances