8 Vent Clearances and Framing
A. Pipe Clearances to Combustibles
WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:
•Between ceiling firestops
•Between wall shield firestops
•Around vent system
Failure to keep insulation or other material away from vent pipe may cause over heating and fire.
B. Wall Penetration Framing
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestop(s). The wall shield firestop maintains minimum clearances and prevents cold air infiltration.
• The opening must be framed on all four sides using the |
same size framing materials as those used in the wall |
construction. |
3 in.
(76 mm)
Sheetrock
2 x 4 or 2 x 6 header
WALL
Air space clearance to bottom and sides of horizontal pipe must be at least 1 in. (25 mm)
No combustible framing to be located within shaded area.
(38 mm)
• SLP pipe - A wall shield firestop must be placed on each |
side of an interior wall. A minimum 1 1/2 in. (38 mm) |
overlap of attached heat shields must be maintained. |
• DVP pipe - A wall shield firestop is required on one side |
only on interior walls. If your local inspector requires a |
wall shield firestop on both sides, then both wall shield |
firestops must have a heat shield attached to them. |
• See Section 10.I. & 10.J. for information for regarding |
the installation of a horizontal termination cap. |
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by
Whenever a
Note: Heat shields MUST overlap by a minimum of
| 10 in. | Vent framing hole. |
|
| |
|
| DO NOT PACK WITH |
12 in. |
| INSULATION OR |
| OTHER MATERIAL. | |
|
|
3 in. (76 mm) | Heat | |
top clearance | ||
|
| Shield |
1 in. (25 mm) | 1 in. (25 mm)clearance | |
| bottom & sides | |
clearance |
| |
|
| |
around vertical |
|
|
sections |
| Wall |
|
| Shield |
|
| Firestop |
3 in. (76 mm) top clearance
Heat
Shield
1 in. (25 mm) clearance bottom & sides
The center of the |
| |
framing hole is |
| |
1 in. (25mm) above |
| |
the center of the | A* | |
horizontal vent pipe. | ||
|
Framing should be constructed of 2 X 4 lumber or heavier.
WALL
Figure 8.1 Vent Pipe and Horizontal Venting Clearances To Com- bustible Materials
| * To center of pipe. | |
|
|
|
Appliance |
| A |
IDV4833 |
| |
IDV6247 |
|
Figure 8.2 Wall Penetration