L.Installing External Refractories
Open Refractory Package (Figure 15.17)
•1 - LH side refractory panel
•1 - RH side refractory panel
•1 - Front hearth refractory panel
Notches indicate top of refractory
Right
Left
Front Hearth
Figure 15.17 Refractory Pieces
Install Side Refractories
•Locate right side refractory panel. See Figure 15.17.
•Install rod in hole in glass frame top. See Figure 15.18.
Insert Pin
Notch
Figure 15.18 Insert Pin into Top Frame
•Install rod with swedge (Figure 15.19) in hole in glass frame bottom. See Figure 15.20.
•Repeat for the left side refractory panel.
Swedge
Figure 15.19 Swedge
Insert Pin | Swedge |
|
Figure 15.20 Insert Pin into Bottom Frame
Bottom Front Hearth Refractory
•The firescreen must be pulled up to install the hearth refractory (Figure 15.21). Slide hearth refractory under side refractories until tight against glass. See Figure 15.22.
Figure 15.21 Move Firescreen
Figure 15.22 Placing Bottom Front Hearth Refractory
Figure 15.23 Finished Refractory Installation
50 | Heatilator • ICON |