5. For safe operation

1.Operate power equipment only at reasonable hours-not early in the morning or late at night w h e n p e o p l e m i g h t b e d i s - turbed. Comply with times listed in local ordinances.

2.To reduce sound levels, limit the number of pieces of equipment used at any one time.

3.Operate power blowers at the lowest possible throttle speed to do the job.

4. Check your equipment before operation, especially the muffler, air intakes and air filters.

WORKING PLAN

• W h e n p l a n n i n g y o u r w o r k schedule, allow plenty of time to rest. Limit the amount of time over which the product is to be used continuously to some- where around 30 ~ 40 minutes per session, and take 10 ~ 20 minutes of rest between work sessions. Also try to keep the total amount of work performed in a single day under 2 hours or less.

FUEL

WARNING

To reduce the risk of fire and burn injury:

a)Handle fuel with care. It is highly flammable.

b)Do not smoke while handing fuel.

c)Do not refuel a hot engine.

d)Do not refuel a running engine.

e)Avoid spilling fuel or oil. Always wipe unit dry before using.

f)Move at least 10 ft. (3 meters) away from the fueling point be- fore starting engine.

g)Always store gasoline in a con- tainer approved for flammable liquids.

h)Make sure the unit is properly assembled and in good operat- ing condition.

BEFORE STARTING THE

ENGINE

Each time before starting the engine, inspect the entire unit to see if every part is in good order and is securely tightened

GB-6

in place. If any damage is found in the fuel line, the exhaust line, or the ignition wiring, do not use the blower until it has been re- paired.

IMPORTANT

Before starting operation, al- ways make sure to check if any obstacles are left inside the vo- lute case and net. The obstacles may cause damage on fan and volute case and serious injury.

WARNING

C h e c k t o s e e i f t h e s h o c k - absorbing rubber mount has become cracked or otherwise damaged. Note that failing to replace this rubber mount when it has become cracked or dam- aged may cause the engine to come loose from its frame dur- ing use, thus resulting in pos- sible serious bodily injury.

If cracked, be sure to replace without delay.

WARNING

To reduce the risk of injury asso- ciated with contacting rotating parts, stop the engine before installing or removing attach- ments. Do not operate without net in place. Always disconnect the spark plug before perform- ing maintenance or accessing movable parts.

USING THE PRODUCT

1.Check the work area that the blower will be used in and re- move or cover all valuables that may be damaged by the air blast or thrown debris.

2.To reduce the risk of injury as- sociated with thrown objects.

a)Watch out for children, pets, open windows or freshly washed cars, and blow debris safely away.

b)Use the full blower nozzle exten- sion so the air stream can work close to the ground.

c)Do not allow bystanders in work area.

Page 7
Image 7
Hitachi RB160EF owner manual Working Plan, Fuel, Before Starting Engine, Using the Product

RB160EF specifications

The Hitachi RB160EF is a robust and versatile piece of construction equipment designed for efficiency and performance in demanding work environments. Renowned for its reliability and advanced technology, the RB160EF represents a significant evolution in excavator design, catering to construction, demolition, and heavy-duty applications.

One of the standout features of the Hitachi RB160EF is its powerful and fuel-efficient engine. The machine is equipped with a high-performance engine that not only delivers impressive horsepower but also complies with stringent emission regulations. This ensures that operators can work efficiently while minimizing their environmental impact, a critical consideration in today's construction industry.

The RB160EF is designed with operator comfort and ease of use in mind. Its spacious and ergonomically designed cabin comes equipped with advanced controls, allowing operators to achieve precision in their work. The cabin is also fitted with large windows that provide excellent visibility, enhancing safety and operational efficiency. Noise and vibration levels have been minimized, ensuring a comfortable working environment even during extended use.

In terms of technology, the Hitachi RB160EF features innovative hydraulic systems that offer superior lifting and digging capabilities. The hydraulic components are designed for optimal performance, allowing for fast cycle times and precise control. This technology is complemented by advanced sensors that monitor performance metrics, ensuring that the equipment operates within optimal parameters, consequently improving productivity.

Another key characteristic of the RB160EF is its durability. Constructed with high-strength materials, this excavator can withstand the rigors of heavy-duty applications. The undercarriage is designed for improved stability and traction, making it suitable for various terrains and challenging job sites. Additionally, regular maintenance is simplified, ensuring that the RB160EF remains functional and reliable over its lifespan.

Versatility is another hallmark of the Hitachi RB160EF. With the ability to use a wide range of attachments, operators can easily transition from digging to lifting, crushing, or even grading tasks. This adaptability makes the RB160EF an invaluable asset on any job site, capable of tackling diverse challenges with ease.

In conclusion, the Hitachi RB160EF combines power, efficiency, and advanced technology, making it a leading choice for construction professionals. Its user-friendly design, commitment to sustainability, and versatility ensure that it meets the demands of modern construction and enhances productivity on every project.