CURTAINS AND DRAINBACK PANS, MODEL FT900S

Curtains and drainback pans must be in their proper places, Fig. 33 . . .

Hang a short curtain on the unload side of each upper prewash and wash arm.

Hang a long curtain on both sides of every section joint.

Hang two long curtains at the load end.

Hang one long curtain at the unload end.

Drainback pan locations are shown for reference only.

FT900S

R TO L OPERATION 4' CENTER SECTION

FINAL RINSE ARM

WASH ARM

TWO SHORT

CURTAINS

AT UNLOAD SIDE

OF UPPER ARMS

ONE LONG CURTAIN

AT UNLOAD END

PREWASH ARM

THREE PAIRS OF

LONG CURTAINS

UNLOAD

LOAD

ONE SHORT

ONE LONGDRAINBACK PAN

DRAINBACK PAN

FT900S

 

L TO R OPERATION

 

4' CENTER SECTION

FINAL RINSE ARM

 

 

PREWASH ARM WASH ARM

THREE PAIRS OF LONG CURTAINS

LOAD

TWO SHORT

CURTAINS

AT UNLOAD SIDE

OF UPPER ARMS

ONE LONG CURTAIN

AT UNLOAD END

UNLOAD

ONE SHORT

DRAINBACK PAN

ONE LONG

DRAINBACK PAN

Fig. 33

– 13 –

Page 13
Image 13
Hobart FT900SDBD, FT900SBD, FT900DBD, FT900BD Curtains and Drainback PANS, Model FT900S, To L Operation 4 Center Section