Conveyor Drive Chain

Inspect the drive chain (Fig. 36) regularly and lubricate as required with Hykogeen Concentrate A (supplied).

Conveyor Shaft Flange Bearings

Located at both load and unload ends of the machine and at the front and back, these bearings should be lubricated every four months. Grease fittings at each of the four bearings, a grease gun and 16 ounces of Chevron SRI #2 grease are provided for this purpose. Fig. 37 shows one of the take-up units at the load end; Fig. 38 shows one of the conveyor bearings at the unload end.

CONVEYOR TAKE-UP UNIT

GREASE FITTING

GREASE

FITTING

LUBRICATE GUIDES

Fig. 37

Fig. 38

Conveyor Take-Up Unit

Lubricate the two conveyor take-up unit guides at the load ends of the machine at least twice a year using the Chevron FM Grease ALC EP 2, provided for this purpose.

CONVEYOR SPEED ADJUSTMENT

The conveyor speed comes preset from the factory. Conveyor speed can be adjusted to run faster or slower by the customer. Refer to User Programming, pages 15 – 19.