3-9. Installing Gas Supply

. DO NOT use Argon/Mixed gas regulator/flowmeter with CO2 shielding gas. See Parts List for optional CO2 gas regulator/flow- meter.

1

4

2

3

5 7

Argon Gas Or

Mixed Gas

6

Rear Panel

Tools Needed: 1-1/8, 5/8 in

Obtain gas cylinder and chain to running gear, wall, or other stationary support so cylinder cannot fall and break off valve.

1Cap

2Cylinder Valve

Remove cap, stand to side of valve, and open valve slightly. Gas flow blows dust and dirt from valve. Close valve.

3Cylinder

4Regulator/Flowmeter Install so face is vertical.

5Regulator/Flowmeter Gas Hose Connection

6Welding Power Source Gas Hose Connection

Connect customer supplied gas hose between regulator/flowmeter gas hose connection, and fitting on rear of welding power source.

7 Flow Adjust

Typical flow rate is 20 cfh (cubic feet per hour). Check wire manufacturer’s recommended flow rate.

Ref. 220 747-A / 802 028-A / Ref. 802 286-E

OM-927 Page 14

Page 18
Image 18