.A complete Parts List is available at www.HobartWelders.com
7-7. Replacing Switch And/Or Head Tube
! Turn Off welding power source /wire feeder and disconnect gun.
1 Remove handle locking nut.
3 | Slide handle. |
2 Remove switch | housing. Install new switch and |
connect leads (polarity is not important). Reassemble in reverse order. If replacing head tube, continue to end of figure.
4 Secure head tube in vice.
5Loosen jam nut. Remove from vice and turn head tube out by hand.
6
7 Place head tube in vice and tighten until nuts are tight.
8Remove from vice. Reposition handle and install switch housing. Secure with handle locking nut.
Tools Needed:
19 mm
Ref. 800