3-10. Installing Gas Supply
Obtain gas cylinder and chain to running gear, wall, or other stationary support so cylinder cannot fall and break off valve.
.DO NOT use Argon/Mixed gas regulator/flowmeter
with CO2 shielding gas. See Parts List for optional CO2 gas regulator/flowmeter.
5
1
4
2
3
7
Argon Gas Or
Mixed Gas
6
1Cap
2Cylinder Valve
Remove cap, stand to side of valve, and open valve slightly. Gas flow blows dust and dirt from valve. Close valve.
3Cylinder
4Regulator/Flowmeter Install so face is vertical.
5Regulator/Flowmeter Gas Hose Connection
6Welding Power Source Gas Hose Connection
Connect customer supplied gas hose between regulator/flowmeter gas hose connection, and fitting on rear of welding power source.
7 Flow Adjust
Typical flow rate is 20 cfh (cubic feet per hour). Check wire manufacturer’s recommended flow rate.
Rear Panel
Tools Needed:
Ref. 220