5-6. Removing Nozzle, Contact Tip, And Adapter, Changing Liner, And Cleaning Gun Casing

2

3

4

 

 

 

 

 

Head

1

 

Tube

 

 

7/16 in

5/8 in

Remove nozzle, contact tip, and adapter.

Blow out gun casing.

3/4 in

(20 mm)

Liner

Stickout

Tools Needed:

5/8, 7/16 in

YTurn off welding power source/wire feeder.

1Nozzle

2Contact Tip

3Tip Adapter

4Nozzle Adapter

.Wire size stamped on tip − check and match wire size.

Cut off wire and disconnect gun from feeder.

Unscrew and remove liner.

Lay gun cable out straight before installing new liner.

Reassemble gun in reverse order from taking it apart.

Install

Liner

.Thread wire according to

welding power source/wire feeder manual.

804 466-A

OM-192 440 Page 27

Page 31
Image 31
Hobart Welding Products 250 installation instructions Turn off welding power source/wire feeder