19.BOOM INSTALLATION

Push gooseneck pin through mast and fasten main furling handle with clevis pin and ring. (FIGURE 36)

Attach topping lift wire to outboard end of boom.

20.2Move and secure the traveller car to the left side of the boat. Using the mainsheet, sheet in tight. Now tighten the left shroud by moving it down two or three holes in the adjuster. Secure the shroud with a clevis pin and ring. (FIGURE 38)

FIGURE 36

20.MAINSHEET ATTACHMENT

20.1Attach the main sheet system as shown. Tie off the traveler line end (B) with a figure- eight knot. (FIGURE 37)

FIGURE 37

FIGURE 38

20.3Release the tension on the mainsheet and move the traveller to the right side. Repeat to tighten the right shroud.

20.4Release the tension on the mainsheet when the tightening procedure is finished and return the boom to its normal position.

NOTE: Whenever the boat is set up, tightening will be required to achieve proper shroud tension.

17

Page 19
Image 19
Hobie 21 manual Boom Installation, Mainsheet Attachment