40000287.qxd 13/11/2003 13:02 Page 6

Installation & testing

Remove the machine from the packaging - close to where it will finally be positioned - and proceed as follows:

On the back of the machine

1) Remove the central screw A and side screws B and pull out the transit bracket C along with the red locator.

2) Tilt the machine forward and remove the polystyrene spacers.

3 Cover the central hole using the cap

enclosed in the instructions bag.

4)Adjust the two feet at the front to level the machine.

5)Tilt the machine forward and locate the base panel by (1) removing the

paper backing from the adhesive tape,

(2) locate the base panel in the front of the machine, (3) offer the base panel up to the base of the washing machine and locate the two push clips.

6

Page 6
Image 6
Hoover HF7 160E manual Installation & testing