ASSEMBLY STEP 1 |
|
|
| |
| HARDWARE BAG 1 CONTENTS : |
| A | Cut the yellow banding straps and lift the |
|
|
|
| running deck upward to remove all contents |
BOLT (A) | SPRING WASHER (B) | ARC WASHER (C) |
| from underneath the running deck. |
20 mm | 8.2 mm | 8.2 mm | B | Open hardware bag 1. |
Qty: 6 | Qty: 6 | Qty: 6 | ||
|
|
| C | Slide main frame boot up console |
| LEAD WIRE |
|
| mast. Place right console mast over |
|
|
| main frame bracket. | |
|
|
|
| |
|
|
| D | Pull lead wire through right console |
|
|
|
| mast. After pulling the lead wire through |
|
|
|
| the mast, the top of the console cable |
|
|
|
| should be located at the top of the mast. Detach |
|
|
|
| and discard lead wire. |
CONSOLE MAST |
|
|
| Note: Do not pinch console cable when |
MAIN |
|
|
| placing the mast onto the main frame |
|
|
| bracket. | |
FRAME |
|
|
| |
BOOT | CONSOLE CABLE |
|
| |
|
|
| E | Attach console mast to main frame |
BOLTS (A) |
|
|
| bracket using 3 bolts (a), 3 spring |
SPRING |
|
|
| washers (b) and 3 arc washers (c). |
|
|
|
| |
WASHERS (B) |
|
| F | Slide main frame boot down over main |
ARC WASHERS (C) |
|
| ||
|
|
| frame bracket. | |
|
|
|
| |
MAIN FRAME BRACKET |
| G | Repeat steps | |
6 |
|
|
|
|